Category: Case Studies

Posted In: Case Studies , Company News

Polaris visits Serv-I-Quip to receive their new Brake DataFill system

Polaris visits Serv-I-Quip to receive their new Brake DataFill system

Read More
Posted In: Case Studies

Paccar Canada set for Increased Capacity

Paccar, the manufacturer of North America’s leading Truck brands – Kenworth and Peterbilt, based in Ste. Thérèse, Quebec in Canada was challenged with meeting increased production demand. Paccar had a Truck production line requiring over a 100 ft in build length where they had three separate fluid filling stations that were utilized to put the […]

Read More
Posted In: Case Studies

Navistar Challenges Serv-I-Quip

When Navistar needed an economical solution to a difficult fluid fill scenario, Serv-I-Quip was one of the vendors asked to review the project and submit a proposal. A height restricted fill area and a mixed production line that required fills on either side of the cab presented a unique challenge. In order to accommodate four different fluids on either side of the cab and a line speed that required overlapping fill cycles, two overhead rail mounted motorized carriers would be needed.

Read More

Serv-I-Quip Delivers for Honda

We would like to thank Honda Motor Company of America for the opportunity to provide an online transmission fill system to meet the mixed production needs at the Marysville, OH plant. The Honda crew that supervised the design, build, testing and install were a pleasure to work with and ensured a successful project.

Read More
Posted In: Case Studies

Assembly Magazine Publishes Case Study of Serv-I-Quip Solution at Whirlpool

For several months in 2009, appliance manufacturer Whirlpool Corp. faced a unique production challenge regarding its refrigerators. The appliances were passing the helium leak test, but failing the refrigerant leak test, which was performed manually in-line by operators using sniffer probes.

Read More

Pennsylvania Gets Behind Harley Davidson

After announcing a major restructuring to better align the company with current economic conditions, Harley Davidson management initiated an analysis to determine whether major restructuring at the York, PA facility could achieve cost and efficiency targets that would continue to make it a viable production facility. The analysis produced a plan that led to the joint efforts of the local labor force, company management, and the Pennsylvania State government.

Read More